The university's IT infrastructure has developed over the past 20 years; it's built up of different solutions and systems that were introduced by the staff, students and third-party contractors. As a result, the infrastructure became hard to maintain – cables were wearing out; the equipment was idle and kept breaking down; solving each problem was taking too much time.

Furthermore, computer performance could no longer satisfy the requirements of the departments and laboratories, and old hardware did not support the university's engineering software.

To get a subsidy for IT infrastructure modernisation, the university had to provide project documentation along with a list of necessary equipment. To do so, the university contacted VimpelCom, and the latter outsourced the development of the IT infrastructure modernisation project to the company's strategic partner, ICL Services.

Key Challenges

  • The project's goal is to plan out a new IT infrastructure for the university based on the customer's business needs. The new project has to:

    • take into account the requirements of different institutes and laboratories in terms of computer performance, network connectivity and information security;
    • incorporate the existing equipment from different vendors as much as possible;
    • ensure high performance and fault tolerance.
Solution

Implemented our solution

  1. During the pre-project inspection, ICL Services specialists travelled to the customer's facility, interviewed university staff and assessed the spaces. This resulted in a project timeline that was used to coordinate the choice of tech solutions and methods of their implementation with the customer at every stage.

    The project can be divided into several modules.

    Server infrastructure. The project includes four servers, one storage system, one slow storage, a control switch, two data centre cores, backup site switches and a backup storage system server.

    The plan features over 20 firewalls, 500 optical transceivers for access switches and 50 aggregation switches. Huawei was the main equipment vendor.

    Engineering infrastructure. The project involves setting up a small data centre, a diesel generator, UPS units for fault tolerance, a power supply system and lighting.

    Automatic gaseous fire suppression system. The planned out gaseous fire suppression systems will automatically detect fires, calculate the required amount of the extinguishing agent and start extinguishing the fire automatically. The plan includes a separate automatic gaseous fire suppression system for the data processing centre.

    Monitoring systems. The project includes a LAN management and monitoring system and a general monitoring system for all equipment.

    LAN and wireless networks. A Wi-Fi network with 250 access points was planned out for seven multi-storey university buildings. This solution helped increase the coverage to 95%.

    CCTV and PACS. ICL Services specialists also developed project documentation for the closed-circuit television system and physical access control systems.

    At the end of the pre-project inspection, the customer received a printed set of drawings and an electronic copy of all documents. ICL Services experts also helped create the terms of reference for project implementation.

Results

  • The customer received a detailed description and a specific plan for IT infrastructure development and organisation. The project involves:
  • 1) Doubling the server capacity, which will provide all divisions with the required capacity and help create a virtualisation environment.
  • 2) Introducing a system for backups and hardware fault tolerance, which did not exist before.
  • 3) Developing a local area network management and monitoring system for all equipment.
  • 4) The modular design of the IT infrastructure and the description of each element in each system will make it easier for the customer to operate the systems and scale them up.

Drop us a line

Contact us

Request a call

Name*
Phone*
Email*
Company*
Please see the Privacy Notice further information regarding your rights.

I have read the Privacy Notice and consent to the processing of my personal data

icl-services.com uses cookies, and by continuing browsing the website you give your consent to the use of cookies by us. Otherwise you should leave our website after reading this.

Ask a question

Name*
Email*
Company*
Position*
Phone*
Message*
Please see the Privacy Notice further information regarding your rights.

I have read the Privacy Notice and consent to the processing of my personal data

Request a call

Name*
Phone*
Email
Company*
Please see the Privacy Notice further information regarding your rights.

I have read the Privacy Notice and consent to the processing of my personal data

Up